Finish a basement
Walls & framing

Finish a basement

PRO STEP
Foam, framing, drywall, a drop ceiling and the floor — in the order the inspector wants it.
0 of 19 answers are yours. The rest are typical defaults — check each one.
Room length
default
The area you’re finishing, wall to wall.
ft
in
Room width
default
ft
in
Height: slab to bottom of the joists
default
After heavy rain the basement is…
default
Foundation walls to finish
default
Foam on the concrete
default
Batts in the stud cavities?
Unfaced R-13 — no plastic vapor barrier.
Climate zone
default
Your county sets the climate zone (IECC Table R301.1). “Not sure” shows what each zone asks for.
New interior walls (total length)
default
Office, bedroom or storage walls, up to 60 ft. 0 for one open room. For more, add an Interior wall Sheet.
ft
in
Doors in those walls
default
1
Joists overhead run along the room’s…
default
Look up: the boards above you all run one way.
Ceiling
default
Drywall type
default
Sheet size
default
Floor
default
Outlets
default
10
Recessed lights
default
10
Adding a bathroom?
Will anyone sleep down there?
Area 657 sq ft
Studs 108