Prep, primer, paint and supplies — walls, ceiling, trim and doors.
Sheet A-1 · Paint a room

12′ × 12′ room

DIY OK
Paint
2
gallons, all products
Walls
333
sq ft
Ceiling
—
not painted
Coats
2
finish
6–8 h of work
Usually a weekend: coats need 2–4 hours between them.
Draft
The rules behind this Sheet are waiting for a licensed pro’s sign-off.

Drawing

The room, unfolded
1
Ceiling Not painted on this job.
2
Walls Net 333 sq ft after openings.
3
Door 21 sq ft deducted each.
4
Window 15 sq ft deducted each.
Walls folded flat around the ceiling so every surface you paint is visible. Floor edges are on the outside.

What to buy

7 items
Save to your jobs to check things off in the store.
Buy all of one color at the same time and mix the cans together before you start — tints can drift between batches.
Paint
Wall paint
eggshell, 2 coats
2 gallons
Interior latex.
Painter’s tape 1.41″ × 60 yd
1 roll
Masks trim and ceilings.
Canvas drop cloth 9×12
9×12 canvas
2
Doesn’t slide like plastic; reusable.
Plastic sheeting 9×12
1 pack
Covers furniture.
Lightweight spackle
8 oz
1 tub
Fills nail holes and dings; sands easily.
Roller covers 9″
⅜″ nap
2 covers
Nap length depends on wall texture.
Tray liners
fits your tray
1
One per color.
Try a color on your wall
Take a photo of the room, tap a wall, and see it in a new color with its shadows kept. On your device, nothing uploaded.

Tools

You own 0 of 10 must-haves
Tap the ones you already own. That builds your Tool Shed as you go — no setup.

Must have

The job stalls without it.

Nice to have

Faster or cleaner, not required.

Order of work

6–8 h of work
01
Clear the room, cover the floor, take off outlet and switch plates.
02
Patch holes; sand smooth when dry.
Wait 1–4 h — patches dry before sanding
Lightweight spackle: about an hour for small holes; deep fills take longer. Setting compound for cracks hardens in its listed minutes — see the tub or bag.
03
Tape the edges you don’t want painted.
04
No primer needed — spot-prime patches only.
Check first
New drywall or a big color change? Prime — skipping it means blotchy flashing and extra coats.
05
Box the paint: pour every gallon of a color into one bucket and mix, so the color doesn’t shift between walls.
Check first
Every gallon of a color mixed together in one bucket before you start.
06
Cut in along the ceiling and corners with the angled brush.
07
Roll walls top to bottom in 3×3 ft sections, keeping a wet edge. Second coat once the first is dry to recoat (see the can).
Check first
Right roller: ⅜″ nap for these walls — load it lightly so it doesn’t drip.
Wait 2–4 h — walls: first coat dries before the second
Latex: usually 2–4 h before the next coat (longer when it’s cool or humid) — see the can.
08
Pull tape at a 45° angle while paint is slightly soft.
09
Put the plates back. Label a leftover can for touch-ups.

Mistakes that ruin the job

3 mistakes
1
Skipping primer when it’s needed
On new drywall or a big color change you get blotchy “flashing” and one or two extra coats.
2
Not boxing the paint
Two gallons of the “same” color can differ. Mix them together before you start.
3
Wrong nap, overloaded roller
Drips and texture that doesn’t match. ⅜″ for smooth walls, ½″ light texture, ¾″ heavy.

Plan it

The load

To haul
30 lb
from the store to the room
Helpers
0
a solo job
Heaviest
Wall paint · 2 gal · 22 lb

When you’ll finish

Pick when you can start and how many hours you have.
Hours you can work
Each weekday evening
0
h
Each weekend day
8
h
Saved for every Sheet. Waits run overnight and on days off; work only fills the hours you have.

DIY vs hiring it out

Estimate
Typical US store prices and labor rates, not a quote. A real price can differ a lot.

Do it yourself

Materials
$140–$190
Tools to buy
10 must-haves you don’t own
9″ roller frame, Extension pole, 2½″ angled sash brush, Paint tray, …
Rentals
none
Your time
6–8 h
Total
$140–$190 + tools

Hire a pro

Materials + 15%
$160–$220
Pros mark up what they buy
Labor
3.4 h × $65–$95
$220–$320
Their time
3.4 hours
Permits
usually none
Total
$380–$540

Before you go

0 of 5 checked
The small stuff that causes a second trip to the store.

Rules used

6 rules · Draft
Every number on this Sheet comes from these rules. A licensed pro reviews each one before a Sheet is marked verified.

Save, share, print

Project
Paint a room
Sheet
A-1
Date
Scale
Not to scale
DIY time
6–8 h
Rules
Draft — pending pro review